Question 1
In which of the following types of testing is the fully integrated system tested by the test team within the organization?
Integration testing
Acceptance testing
Alpha testing
Beta testing.
In which of the following types of testing is the fully integrated system tested by the test team within the organization?
Integration testing
Acceptance testing
Alpha testing
Beta testing.
Consider a function that takes two strings as input and compares the length of two strings. If the lengths of the strings are equal, it returns 0. If the length of the first string is greater than that of the second string, it returns a positive integer. If the length of the first string is less than that of the second string, it returns a negative integer.
Identify the number of equivalence classes for black box testing of the program discussed above.
2
3
4
5
Which deployment strategy gradually rolls out changes to a small subset of users?
Blue/Green Deployment
Canary Deployment
Versioned Deployment
None of these
Sign in with Google — it is free — to see every question with its answer and explanation, practise it in learning mode, or take it as a timed mock test.
The IIT Madras BS Software Engineering (Software Engineering) End Term paper sat on 22 Dec 2024, in the September 2024 term, set QDB3: 30 questions for 100 marks in 180 minutes. The first 3 questions are below. Sign in with Google — it is free — to see the whole paper with its answers and explanations, in learning mode or as a timed mock test.
| Feature | Software Engineering End Term 22 Dec 2024 Set QDB3 at a glance |
|---|---|
| Term | September 2024 term |
| Subject | Software Engineering |
| Course code | BSCS3001 |
| Questions | 30 |
| Marks | 100 |
| Duration | 180 min |
| MCQ | 25 |
| MSQ | 5 |
| Official paper | IIT M DEGREE AN EXAM QDB3 22 Dec 2024 |
| Negative marking | No negative marking. |
| Updated |