Industry 4.0 Quiz 1: 7 July 2024 (May 2024 term)

The IIT Madras BS Industry 4.0 (Industry 4.0) Quiz 1 paper sat on 7 Jul 2024, in the May 2024 term: 17 questions for 20 marks in 120 minutes. Every question is below with its answer. Take it as a timed mock test to be marked, or read it through first.

Questions
17
Marks
20
Duration
120 min
MCQ
6
MSQ
5
Numerical
6

Updated

Official paper: IIT M DEGREE AN EXAM QDB2 7 July 2024 · No negative marking.

Question 1

+1 markOne correct option

Match Col A with Col B for landmark outcome of industrial era

  1. A

    1.0:CNC, 2.0:Mass production, 3.0:Digitization, 4.0:Steam Engine

  2. B

    1.0:Steam Engine, 2.0:mass production, 3.0:digitization, 4.0:CNC

  3. C

    1.0:Mass production, 2.0:Steam Engine, 3.0:digitization, 4.0:CNC

  4. D

    1.0:Steam Engine, 2.0:mass production, 3.0:CNC, 4.0:Digitization

Show answer

Correct answer

  • D

    1.0:Steam Engine, 2.0:mass production, 3.0:CNC, 4.0:Digitization

Question 2

+1 markOne correct option

Identify the Industry 4.0 version of transportation.

  1. A

    IC engine

  2. B

    Electric car

  3. C

    Hyperloop

Show answer

Correct answer

  • C

    Hyperloop

Question 3

+1 markOne correct option

Following is the layout from an aircraft manufacturing company. Identify the layout from the figure below.

  1. A

    Product layout

  2. B

    Process Layout

  3. C

    Group layout

  4. D

    Fixed position layout.

Show answer

Correct answer

  • D

    Fixed position layout.

Question 4

+1 markOne correct option

Select the appropriate layout for Quadrants A, B, D in the following figure:

  1. A

    A: Group layout, B: Product layout , D: Process layout

  2. B

    A: Product layout, B: Process layout , D: Group layout

  3. C

    A: Process layout, B: Group layout , D: Product layout

Show answer

Correct answer

  • C

    A: Process layout, B: Group layout , D: Product layout

Question 5

+1 markOne correct option

The Production rate of an assembly line is determined by its

  1. A

    Slowest station

  2. B

    Fastest station

  3. C

    Idle station

  4. D

    None of these

Show answer

Correct answer

  • A

    Slowest station

Question 6

+1 markOne or more correct options

Select the layout(s) which do not require general supervision:

Select all that apply.

  1. A

    Product layout

  2. B

    Process layout

  3. C

    Group layout

  4. D

    Fixed position layout

Show answer

Correct answer

  • B

    Process layout

Question 7

+1 markOne or more correct options

Which of the following is an advantage of Process Layout?

Select all that apply.

  1. A

    Low material handling

  2. B

    Total production time per unit is small

  3. C

    Low training cost for the operators

  4. D

    It can accommodate high variety of products

Show answer

Correct answer

  • D

    It can accommodate high variety of products

Question 8

+1 markOne or more correct options

Which of the following is an advantage of Product Layout?

Select all that apply.

  1. A

    Small in-process inventory

  2. B

    It can accommodate high variety of products

  3. C

    High utilization of machines

  4. D

    Low investment

Show answer

Correct answer

  • A

    Small in-process inventory

Question 9

+1 markOne or more correct options

Select the correct statements from below:

Select all that apply.

  1. A

    Optimal solution in a facility location problem using Euclidean method will result in a region

  2. B

    Optimal solution in a facility location problem using Euclidean method rarely matches the center of gravity

  3. C

    Optimal solution in a facility location problem using Euclidean method will result in a point

  4. D

    Optimal solution in a facility location problem using Euclidean method matches the center of gravity in neither cases

Show answer

Correct answers

  • B

    Optimal solution in a facility location problem using Euclidean method rarely matches the center of gravity

  • C

    Optimal solution in a facility location problem using Euclidean method will result in a point

Question 10

+1 markOne or more correct options

Identify the examples for Offshoring from the list below:

Select all that apply.

  1. A

    Micron Technology, a US based semiconductor giant, setting up a Supply Chain Analytics team, in India.

  2. B

    Micron signs an agreement with Taiwan based TSMC Co., to manufacture sillicon wafer for their ICs.

  3. C

    Western Australia’s electricity network agency assigns Tata Consultancy Services at Pune, to support it with an overhaul of its legacy IT systems, aimed at delivering cheaper and more reliable power.

  4. D

    Tata Motors assigns the manufacturing of its braking system to TACO group.

Show answer

Correct answers

  • A

    Micron Technology, a US based semiconductor giant, setting up a Supply Chain Analytics team, in India.

  • B

    Micron signs an agreement with Taiwan based TSMC Co., to manufacture sillicon wafer for their ICs.

Question 11

+1.5 marksNumerical answer

A factory works for two 8-hour shifts each day and produces a total of 30,000 electric bulbs using a set of workstations. There are 8 activities required to manufacture the bulb, such that the sum of all activity times is equal to 12 seconds. Answer the given subquestions:

What is the cycle time (in seconds) at any workstations (round your answer to one decimal).

Show answer

Correct answer: 1.85 (accepted within ±0.15)

Question 12

+1.5 marksNumerical answer

A factory works for two 8-hour shifts each day and produces a total of 30,000 electric bulbs using a set of workstations. There are 8 activities required to manufacture the bulb, such that the sum of all activity times is equal to 12 seconds. Answer the given subquestions:

What is the theoretical minimum number of workstations required?

Show answer

Correct answer: 7

Question 13

+1 markNumerical answer

Consider the following precedence diagram. It has 12 activities. The numbers in blue and within the braces denote the respective activity times in minutes.

Answer the given subquestions based on the above diagram.

What is the minimum cycle time of the system?(in min)

Show answer

Correct answer: 12

Question 14

+1 markNumerical answer

Consider the following precedence diagram. It has 12 activities. The numbers in blue and within the braces denote the respective activity times in minutes.

Answer the given subquestions based on the above diagram.

What is the maximum cycle time of the system?(in min)

Show answer

Correct answer: 85

Question 15

+1.5 marksOne correct option

Consider the following precedence diagram. It has 12 activities. The numbers in blue and within the braces denote the respective activity times in minutes.

Answer the given subquestions based on the above diagram.

The factory works for one 8-hour shifts each day. Is it possible to achieve an output of 32 units/day,

  1. A

    Yes

  2. B

    No

Show answer

Correct answer

  • A

    Yes

Question 16

+2 marksNumerical answer

Consider the following precedence diagram. It has 12 activities. The numbers in blue and within the braces denote the respective activity times in minutes.

Answer the given subquestions based on the above diagram.

What is the balance delay of the following layout (round it to two decimals)(in %)
(1,2) -> (3) -> (4) -> (5) -> (6,7) -> (8,9) -> (10,11,12)

Show answer

Correct answer: 19 (accepted within ±0.5)

Question 17

+1.5 marksNumerical answer

Consider the following precedence diagram. It has 12 activities. The numbers in blue and within the braces denote the respective activity times in minutes.

Answer the given subquestions based on the above diagram.

What is the efficiency of the given layout? Round off to two decimals without percentage sign (1,2) -> (3) -> (4) -> (5) -> (6,7) -> (8,9) -> (10,11,12)

Show answer

Correct answer: 80.5 (accepted within ±0.5)