Question 6
A 4×16 decoder is implemented using NOT gates (delay = 1 ns) and 4-input AND gates (delay = 2 ns). What is the maximum delay from any input to any output?
Note: If the answer is 4 ns, write 4.
A 4×16 decoder is implemented using NOT gates (delay = 1 ns) and 4-input AND gates (delay = 2 ns). What is the maximum delay from any input to any output?
Note: If the answer is 4 ns, write 4.
Correct answer: 3
Question 6 of 12 in the IIT Madras BS Computer System Design (Computer System Design) Quiz 1 paper sat on 19 Jul 2026, in the May 2026 term (Computer Systems Design 16 Jul 26). It carries 3 marks.