Question 17
Answer the given subquestions on the Overall Equipment Effectiveness of fasteners
manufacturing.
Hint:
Just in case you forgot the formula
Availability = Run Time / Planned Production Time
Run Time = Planned Production Time − Lost Time
Performance = (Total Count / Run Time) / Ideal Run Rate
Quality = Good Count / Total Count
OEE = Availability × Performance × Quality
Calculate the following of the Gear Manufacturing Equipment for a particular week
| Parameters | Week 1 |
|---|---|
| No. of Shifts/ Day (No Holiday on any day of the week) | 3 |
| No. of Hours/Shift | 8 |
| Lost Time in Hours | 24 |
| Designed production speed of gears per Hour | 60 |
| Total Product Output | 6740 |
| Scrap (S) | 122 |
Performance ________%