Quiz Space

Business Data Management · End Term · 11 Dec 2022 · September 2022 term · Set ETD1-2

Question 16: Calculate the following of the Gear Manufacturing Equipm…

Question 16

+1 markNumerical answer

Answer the given subquestions on the Overall Equipment Effectiveness of fasteners
manufacturing.
Hint:
Just in case you forgot the formula
Availability = Run Time / Planned Production Time
Run Time = Planned Production Time − Lost Time
Performance = (Total Count / Run Time) / Ideal Run Rate
Quality = Good Count / Total Count
OEE = Availability × Performance × Quality

Calculate the following of the Gear Manufacturing Equipment for a particular week

ParametersWeek 1
No. of Shifts/ Day (No Holiday on any day of the week)3
No. of Hours/Shift8
Lost Time in Hours24
Designed production speed of gears per Hour60
Total Product Output6740
Scrap (S)122

Availability - _______%

Show answer

Correct answer: 85.5 (accepted within ±0.5)

Question 16 of 26 in the IIT Madras BS Business Data Management (BDM) End Term paper sat on 11 Dec 2022, in the September 2022 term (IIT M DIPLOMA AN1 EXAM ETD1 11 Dec 2022). It carries 1 mark.

This question was also asked in

More questions from this paper

  1. Q1What does marginal utility measure?
  2. Q2An increase in income leads to an increase in demand for:
  3. Q3When computing price elasticity, the slope of the demand curve depends on
  4. Q4What category of SKUs should be kept closer to the processing area?
  5. Q5Which of the following plan stages will typically have the longest span for low technology and quick set up factory ope…
  6. Q6Which of the following is not a source of survey data?(select all that is applicable)
  7. Q7What brings about the change in the following scatter plots?
  8. Q8What does a high Average Days of Inventory signify?
  9. Q9If the sales (volume) of the laptops increase in a particular period, which of the following item(s) also increase(s)?C…
  10. Q10The graphs below indicate which of the following? Choose all that apply
  11. Q11If the current ratio is 2:1 and the Quick ratio is 1.5:1, then which of the following is/are true? (Select all that are…
  12. Q12The decrease in price of a product from INR 10 to INR 8 raised the demand by 30%. What is the elasticity of demand for …
  13. Q13| S. No | Customer ID | Merchant Segment | Device | Test / Control Group | Old Engagement Segment | New Engagement Segm…
  14. Q14| S. No | Customer ID | Merchant Segment | Device | Test / Control Group | Old Engagement Segment | New Engagement Segm…
  15. Q15A nut manufacturing process had scheduled maintenance of two shifts in a particular week. Which components(s) of Overal…
  16. Q17Calculate the following of the Gear Manufacturing Equipment for a particular week | Parameters | Week 1 | |---|---| | N…
  17. Q18Calculate the following of the Gear Manufacturing Equipment for a particular week | Parameters | Week 1 | |---|---| | N…
  18. Q19Calculate the following of the Gear Manufacturing Equipment for a particular week | Parameters | Week 1 | |---|---| | N…
  19. Q20An 8-hour shift of clamp manufacturing process (with no downtime) has an OEE of 0.90 performing at its designed speed a…
  20. Q21Match the following | A. Pareto Principle | 1. A metric to calculate the rate at which customers stop doing business wi…
  21. Q22Which of the following are the functions of a Payment Merchant like G-Pay or Paytm?
  22. Q23Increase in which of the following will increase the Net Margin? Choose all that apply
  23. Q24Consider the dataset. | Candidates | F1: Year of experience | F2: Count Skill | F3: Count_key_projects | F4: When will …
  24. Q25From the table, which of the options best represents the revenue change from 31st March 2022 to 1st April 2022? | Date …
  25. Q26Arrange the following steps while working with unstructured data in a ranking modeling: I. Normalizing\ II. Preprocessi…