Question 1

+1 markOne correct option

Choose the correct term from the Column B for the description given in Column A. Note that one to-one mapping in the table is not necessary.

Column AColumn B
a.1 You can order a mobile phone on Amazon, but can collect the product from the showroomb.1 Impulse buying
a.2 To go to the office, you require a formal pair of trousers. While searching for trousers on Myntra, you came across a leather belt that perfectly complemented your chosen trousers, prompting you to make the purchase.b.2 Multi-channel retailing
a.3 After acquiring a new mobile phone, you considered safeguarding it from scratches by investing in a phone cover. Now, the phone and the phone-cover are---b.3 Complementary product
b.4 Omni-channel retailing
b.5 Substitution product
b.6 Inventory-dependent demand
  1. A

    a.1 : b.4, a.2. : b.3, a.3: b.1

  2. B

    a.1 : b.4, a.2. : b.1, a.3: b.3

  3. C

    a.1 : b.4, a.2. : b.1, a.3: b.5

Show answer

Correct answer

  • B

    a.1 : b.4, a.2. : b.1, a.3: b.3

Question 1 of 19 in the IIT Madras BS Industry 4.0 (Industry 4.0) Quiz 2 paper sat on 23 Nov 2025, in the September 2025 term (IIT M DEGREE AN EXAM QDB2 23 Nov 2025 NEW). It carries 1 mark.

More questions from this paper

  1. Q2In a EOQ calculation, the estimated and actual parameter values are given in Table 1. What is the error in the EOQ calu…
  2. Q3Match the following columns by selecting the correct name from Column B for the labels in column A which are depicted i…
  3. Q4Pranjal is shopping in a departmental store. He has a list of items which he prepared at home itself. He picked a few p…
  4. Q5What does the state variable represent?
  5. Q6What does the action set represents?
  6. Q7Which of the following model corresponds to Exponential Smoothing forecasting model?
  7. Q8Which of the following examples can be referred as cyclic pattern?
  8. Q9Which are the two primary tasks of time series forecasting?
  9. Q10Select the cost(s) from the following list which contribute(s) to the shortage cost:
  10. Q11What is the Critical Ratio?( round off to two decimal places)
  11. Q12What is the optimal order quantity that minimizes Ramu’s total cost?
  12. Q13If the cost of overstocking is less than the cost of understocking, where will the optimal order quantity lies in the i…
  13. Q14Slipline Co. requires 1500 units of plastic ribbon per month. Each plastic ribbon costs Rs. 27 in the market. Placing a…
  14. Q15Slipline Co. requires 1500 units of plastic ribbon per month. Each plastic ribbon costs Rs. 27 in the market. Placing a…
  15. Q16Slipline Co. requires 1500 units of plastic ribbon per month. Each plastic ribbon costs Rs. 27 in the market. Placing a…
  16. Q17Slipline Co. requires 1500 units of plastic ribbon per month. Each plastic ribbon costs Rs. 27 in the market. Placing a…
  17. Q18Slipline Co. requires 1500 units of plastic ribbon per month. Each plastic ribbon costs Rs. 27 in the market. Placing a…
  18. Q19Choose the correct category in Column B for the costs in Column A