Question 5: A factory works for two 8-hour shifts each day and produc…

Question 5

+2 marksNumerical answer

A factory works for two 8-hour shifts each day and produces a total of 30,000 electric bulbs using a set of workstations. There are 8 activities required to manufacture the bulb, such that the sum of all activity times is equal to 12 seconds. What is the cycle time (in seconds) at any workstations (round your answer to one decimal).

Show answer

Correct answer: 1.85 (accepted within ±0.15)

Question 5 of 11 in the IIT Madras BS Industry 4.0 (Industry 4.0) Quiz 1 paper sat on 26 Feb 2023, in the January 2023 term (IIT M DEGREE AN4 EXAM QPE4 26 Feb 2023). It carries 2 marks.

This question was also asked in

More questions from this paper

  1. Q1Identify the Industry 4.0 version of transportation.
  2. Q2What brought the second industrial revolution?
  3. Q3The Production rate of an assembly line is determined by its
  4. Q4Which of the following is an advantage of Product Layout?
  5. Q6Select the correct example for fixed position layout from the following list:
  6. Q7Select the correct statements from below:
  7. Q8Identify the examples for Offshoring from the list below:
  8. Q9Which of the following is/are an allowable grouping of activities to produce the product if the target is to produce a …
  9. Q10What is the balance delay for the line (or lines) identified in the main question? (Enter your answer in % rounded to t…
  10. Q11A factory has three work centers as shown in the picture below. The time required at each centers are shown in the brac…