Question 7
Rana Bakery, a company is using a layout which consists of 9 workstations. 200 sandwiches are produced in a day on this layout. A typical day consists of a single shift which runs for 10 hours. The sandwich-making process consists of 9 activities (the information is provided in the table below).
What is the current efficiency of the line where each activity is performed on a separate workstation (Enter only the numerical value up to two decimal places without the “%” symbol. Example: if the answer is 99.756%” enter only “99.76”)?