Question 17
TSP
Use the distance matrix to construct TSP tours.
| A | B | C | D | E | |
|---|---|---|---|---|---|
| A | - | 18 | 30 | 90 | 54 |
| B | 18 | - | 48 | 84 | 36 |
| C | 30 | 48 | - | 60 | 72 |
| D | 90 | 84 | 60 | - | 24 |
| E | 54 | 36 | 72 | 24 | - |
Based on the above data, answer the given subquestions.
Use “A” as the fulcrum (base) node and use Savings Heuristic to construct the TSP tour. Identify the new edge added in the first merge operation. Enter the new edge and its savings.
Enter an edge XY and an integer as a comma separated list.
NO SPACES, TABS, DOTS, BRACKETS, PARENTHESIS OR UNWANTED CHARACTERS.
Answer format: XY,17